Datoptic RM12-S6.TB - Rackmount Instrukcja Użytkownika Strona 55

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 90
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 54
APPENDIX
164
B-3 Installation
1. Make sure all power to the system is disconnected.
2. The 6Gb/s SAS RAID controller’s battery connector is avail-
able for the optional battery backup module. Connect the BBM
cable to the 12-pin battery connector on the controller.
3. Integrators may provide pre-drilled holes in their cabinet for
securing the BBM using its three mounting positions (NH1, NH2
and NH3)
4. Low prole bracket also provided.
5. The BBM will occupy one PCI slot on the host system.
B-4 Battery Backup Capacity
Battery backup capacity is dened as the maximum duration
of a power failure for which data in the cache memory can be
maintained by the battery. The BBM’s backup capacity varied
with the memory chips that installed on the ARC-12x4 RAID
controller.
B-5 Operation
1. Battery conditioning is automatic. There are no manual pro-
cedures for battery conditioning or preconditioning to be per-
formed by the user.
2. In order to make sure of all the capacity is available for your
Przeglądanie stron 54
1 2 ... 50 51 52 53 54 55 56 57 58 59 60 ... 89 90

Komentarze do niniejszej Instrukcji

Brak uwag